Get started with Production Change Protection
Use this page as the handoff checklist. Start at Step 1 and do not skip the four-scenario proof.Step 1 — Try the product
Create a free account, then open Sandbox in the console. Run the guided authorization tour:- Submit a protected action for evaluation.
- Observe the decision.
- Inspect the permit when the request is allowed.
- Verify the permit.
- Review the audit record.
Sandbox never executes a customer system. It proves the AtlaSent authorization loop, not the readiness of your production topology.
Step 2 — Choose the implementation path
Choose one path for the first production boundary:
Name one production owner and one technical owner. The production owner decides when enforcement may be activated. The technical owner controls the repository, workflow, target, secrets, and rollback procedure.
Step 3 — Connect
Open Connect Production Change. Complete the guided steps:- Create the org-scoped
production.deployprotected action. - Set the approver and organizational-authority requirements.
- Connect GitHub and bind the selected repository.
- Record the rollback plan and required evidence.
- Run the fail-closed rehearsal.
Step 4 — Configure the exact boundary
Confirm these facts before acceptance testing:- requester and executor identities;
- required approver roles and separation-of-duties rule;
- repository and workflow;
- target system, tenant/account, resource, and environment;
- immutable artifact, revision, or payload identifiers;
- change window and emergency rule;
- rollback owner and rollback trigger;
- evidence source for the execution result and observed effect.
Step 5 — Prove all four outcomes
Run these cases on the selected non-production or customer-approved rehearsal boundary:
Review Verification History and the Audit Trail after every run. Record the decision ID, permit-verification outcome, execution result, and observed-effect evidence where available.
Stop if: the native system changes on a refused request, the permit can be reused, changed context is accepted, evidence cannot be correlated, or the authorization path fails open.
Step 6 — Activate
The production owner activates enforcement only after:- all four proof scenarios pass;
- rollback has been rehearsed;
- monitoring and support owners are named;
- the exact target topology is documented;
- the customer accepts the evidence; and
- the selected subscription provides the required production capacity.
- Decisions — what AtlaSent decided and why
- Permits — what exact execution was authorized
- Verification History — whether the execution boundary accepted or refused the permit
- Audit Trail — the reviewable history
- Readiness — independently reported setup states